ENGINEERING PROJECT PORTFOLIO
Selected Technical Assignments
Representative examples of independent engineering reviews, preliminary design and technical compliance assignments for pressure equipment, pharmaceutical process systems and regulated equipment.
Pressure Equipment
Pressure Equipment Design and Compliance Review
Independent review of calculations, manufacturing drawings, materials and technical documentation for a stainless-steel pressure-equipment package.
Main scope
- Calculation and drawing assessment
- Materials and component review
- Deviation identification and resolution
- Technical documentation recommendations
Pharmaceutical Engineering
Pharmaceutical Water-System Preliminary Engineering
Preliminary definition of a pharmaceutical water-treatment system incorporating pretreatment, reverse osmosis and continuous electrodeionisation.
Main scope
- Feed-water and consumption review
- Preliminary system sizing
- Equipment and instrumentation definition
- P&ID and specification support
CE Technical Compliance
CE Compliance Gap Assessment for Laboratory Equipment
Independent gap assessment of technical documentation for laboratory equipment intended for commercialization in European and international markets.
Main scope
- Applicable-legislation assessment
- Standards and documentation matrices
- Preliminary technical-risk review
- Compliance and verification roadmap
Client confidentiality: Project names, client identities, internal references and identifying technical details have been omitted. Further examples may be discussed privately where existing confidentiality obligations allow.